Portal de Caravaca de la Cruz

www.portaldecaravaca.com

Caravaca de la Cruz - SpanishCaravaca de la Cruz - English
detail of Caravaca de la Cruz

 

Press the PSOE on issues relating to stormwater (20/11/2008)

Full note sent by PSOE:

In the plenary session of September last year, the Municipal Group filed a motion that sought to reach an agreement that addresses the problems caused by rainwater, which is customary in our area where it rains a certain intensity , as between September and October almost every year.

Specifically there are constant problems of flooding in certain streets and low, which are attached to the overflow of sewage from the sewage on the streets, resulting in health problems that this represents, in addition to the damage it causes.

For this reason, the points of the motion, calling for the completion of the new stormwater collector Miguel Espinosa (unfinished from almost 10 years), and a corresponding improvement project study of loss networks.

The motion was rejected with the votes of the PP on the grounds that already had or was being done due technical study, although a study today that we have not been made public, nor do we know that development is planned, so we are obliged to file a new motion to the next plenary session with a goal even further.

Sewage overflow occurs quite often on the road at various points as in the Orchard Road in Doctor Robles, Miguel Espinosa, given the inability of the sewerage system to absorb storm water network in the absence separate them.

You are fixing streets in the Old Town or in the pipeline and is not expected to stay out rainwater collecting in places that have problems such as the Calle de la Cruz in the narrow, since there is no plan in this regard for Urban Center.

What we ask in the Motion, as the rapporteur of the same, Alfonso Sanchez, based on "the creation of a Special Infrastructure Plan rainwater collectors the village and its development in several phases."

Please note that currently only in service two rain collectors.

One on Main Street, which still tends to be some problems with the Church of the Savior, and another along Maruja Garrido and Carretera de Murcia, which is missing a small stretch to Rafael Tejeo to collect its aspects.

Priority would be to end the collector of Miguel Espinosa and make one avenue of Andenes, Temple Square, Calle Junquico, continuing Juan Carlos I to converge on that of Miguel Espinosa, which solves the whole area of the urban expansion more currently presents problems, as well as the slopes of the Old Town to Andenes and Temple Square.

Source: Grupo Municipal Socialista de Caravaca

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información