Portal de Caravaca de la Cruz

www.portaldecaravaca.com

Caravaca de la Cruz - SpanishCaravaca de la Cruz - English
detail of Caravaca de la Cruz

 

Press release from the City of Caravaca de la Cruz on the situation of bankruptcy CCL (17/06/2010)

Caravaca City Council was informed last Thursday through information published in the media of the status of bankruptcy proceedings of CCL, a company awarded through open competition of the remodeling project of La Glorieta.

The contract works with the company are not finalized, so that the City will retain the amounts owed to the builder CCL to clarify the legal situation and of payment to suppliers and subcontractors for the work.

To date, the City has only paid three certificates of work amounting to 211,938 euros.

(The remainder, approximately 500,000 euros, will be retained).

At the last Board of Governors agreed to carry out immediately the outstanding works for the completion of this project.

Specifically, the City will implement the following activities: installation of seating and circular planters to line the base of trees, beautifying the Woodland alcorques smaller size, measures of protection and delimitation of the ride, road and parking area; management Traffic and solutions for rainwater collection.

Prior to the completion of those works, the City will proceed to the immediate resolution of the works contract signed with the joint venture awarded the project, if applicable.

Finally, point out that the last two weeks with major rainstorms and hail, it was found that there was no flooding problems in historic buildings in the area of the slide.

In this sense, it is recalled that the City installed a grid-collector access to the Convent of the Carmelite Fathers, a system that has worked well, except for one occasion, during cleaning works had been plugged with sand.

Once your cleaning, as noted in recent days, there is not any flood or water accumulation in this area.

The remodeling project of the slide, with a budget of 750,000 euros, aims to strengthen the presence of historic buildings and monuments located in the preserve as valuable elements of the environment, tree line and pedestrian character.

The renovation includes a new paving which covers over 4,000 square meters and the depression of 30 centimeters square with respect to the state before getting to "elevate" the Bandstand and enhance the visibility of this monument.

The slide was in a very deteriorated state since the last performance had been made in the seventies with the remains of marble.

Source: Ayuntamiento de Caravaca de la Cruz

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información