Makes claims to integrated management plan NATURA 2000 NORTHWEST 17 points (06/02/2013)

ASK THE OPENING OF A consultation process to revise PLACES THAT ARE NOT INCLUDED IN AREAS SCI and SPA and should appear as areas for protection REGULATIONS TO INCLUDE, financing, term extension, DISCUSSIONS, ETC.

Fernando and Alfonso Sanchez Romera.

02/06/2013.

Doing some collection, we can name many EU-funded programs that affect our local and Northwest region, including plans and aid LEADER CAP (Common Agricultural Policy), although the Guidelines and Spatial Plan the Shire (Northwest Guidelines) are not approved (only reached the initial approval in 2009 of a document with serious deficiencies) and also happens to specific instruments Environmental Protection county level, although it have drafted documents that have received European aid.

We recall that in 2003 developed the Sustainable Development Plan and Natural Resource Management in the Northwest Region (there was no interest in passing) but that was the basis for requesting and obtaining European funds a LIFE: "management comprehensive habitat "of the Northwest Region for LICS (Sites of Community Importance).

This project ran from January 1, 2004 - December 31, 2007 (75% EU funded - 25% MURCIA).

Total: 2,630,899 euros.

He had among other objectives the development and approval of Management Plans Sites of Community Importance present in the Northwest Region and its dissemination and technical assistance, although not adopted such management plans during the housing boom, not interested.

Specifically, the Plan for Sustainable Development and Management of Natural Resources in the Northwest Region (which was never approved because other interests prevailed), established peripheral protection LICS you had severe incompatibilities in many areas where plans were approved after partial (eg in Roblecillo in Llano de Béjar area and north of the Buenavista) and other protection and were relegated after the LIG (Geological sights among which are included the sources of the Marquis).

We understand, focusing on the current Management Plan, that despite the time elapsed from an insufficient definition of areas that once declared LIC, which resulted in areas of high environmental value and stay outside without specific protection ( eg the Sierra de las Cabras, part of the Sierra del Gavilan and the Sierra de la Zarza).

To compensate for this, nor define and regulate now conveniently areas of ecological connectivity and buffer (runners), covering 73,920 hectares, about 50% of what is protected, mostly privately owned, since the document is limited its generic regulation in two simple paragraphs.

We therefore propose the extension of the runners and their regulation.

For example it is necessary to expand and regulate the protection zone in the Sierra de la Zarza (with a unique carrascal Region), along with the rush and Lomas de Gadea, with the SPA interconcectándolas Mojantes Mountains.

The existence steppe birds like the bustard justifies this protection.

We consider it essential to avoid failure, the extension of public information within a minimum of three months to open a consultation and information campaign in all municipalities directly affected by applying the appropriate flexibility in the final draft of the plan to make This document is a real opportunity compatibility between environmental conservation and economic activity of the region.

From Socialist ranks we will promote information and debate events and briefings, in collaboration with the Local Group, while we present initiatives the City Council to do the same and to organize debates with leading editors counting and responsible for this Management Plan and affected.

We also consider essential to save this Plan of absolute failure to ensure adequate redistribution of budgets, so that farmers, ranchers and forest owners affected monte, receive a proportionate amounts, to the surface they own with respect to the total scope of protection as well as the limitations that imposes Comprehensive Management Plan and compatible goals and make sustainable farms with environmental conservation.

In this Plan, direct aid to homeowners represent 2% of the total budget (5.5 million euros), although these have 76% of what is being protected.

Overall we see a ridiculous figure of about 90,000 euros (in six years) to 132,000 hectares, equivalent to 12 cents per hectare and year, "10 You need to give them for coffee a year."

Source: PSOE Caravaca de la Cruz

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información