They lament the bad image for our town a day before being debated in Congress the non-legislative proposal in support of the Feast of the horses came as UNESCO's intangible heritage
From the Socialist Municipal Group Caravaca, who always considered nonsense reclassification clearly irregular Roblecillo the estate, we understand that it is time to clarify the extent of the alleged relationship between the developer, Golden Sky, and the plot Librilla and how this farm was reclassified in a meteoric.
This we have been asking since we learned of the first indications.
It caught us by surprise the record that this matter has practiced UCO Civil Guard in the city of Caravaca along all morning, because in January 2009 and then GMSocialista spokesman made aware of the Prosecution initiatives taken on this matter, allegations and complaints, of which the Group provided.
As we have noted in the past, we recall that Golden Sky comes from a corporate network created in August 2004, with headquarters in Librilla, to promote a great urban transformation in a farm of about 1,000 acres, situated as we all know in the place of Roblecillo in Archivel.
Become part of this network, businessmen from different parts of the Region, including ACADI consultant, main protagonist of the plot of urban corruption uncovered in Librilla, which participates José Luis Cano (deceased), then a senior member of the Ministry of Presidency, responsible for the technical support to municipalities, and the engineer Domingo Penalver.
It is during the summer of 2004 when, apparently, from the City Council is encouraging the owner of the property so that instead of building large pig feedlots (with project and presented), is the now failed apuntase Resort and likewise model is tries to convince, unsuccessfully, to municipal group spokespersons that the requalification of Roblecillo,-forest area whose protection was approved a few months earlier in the review of the General Plan (PGMO) in its initial approval, was beneficial to the municipality .
Moreover, the reports themselves municipal technicians, totally contrary to proceed with the reclassification the farm due to lack of consistent both with the PGMO, then review, as with the provisions of the Land Act, all in order to shorten the deadlines.
Specifically it is from September 2004, when despite technical reports contrary, would dramatically reclasificatorio process was developed, culminating in less than a year, through a planning agreement to check out in the place of Roblecillo, only the source property owned by Juan Jimenez, and other adjoining properties acquired by Golden SKY, and leave the rest of farms protected with the same characteristics.
The City Council in this way would pocket in installments € 8.5 million in compensation, while spreading creating jobs figures that almost exceeded the population of the municipality, amounts which the City has not received one euro to date.
Socialists believe you can not understand all this without the presence of the consultant ACADI, besides being GOLDEN SKY corporate member, participates in drafting the planning agreement, and the second is that the process keeps certain parallels both dates as by the way with the reclassification of the property protected Zerrichera at Eagles (SCI and SPA).
In this sense we say that the process of Roblecillo reclasificatorio goes through the same DGs responsible for the Natural Environment, Environmental Quality and Planning, charged by the Zerrichera and also with direct connections to the Presidential.
All this security would assume its promoters that happen smoothly by all higher courts until final approval once guaranteed the unconditional support of that traffic by the government team of PP.
Source: PSOE Caravaca de la Cruz