This week they started the works of infrastructures in the Las Fuentes del Marqués included in the Works and Services Plan, 2009 the City of Caravaca.
The company caravaqueña Rafael Salazar and Sons carried out during the next three months than budgeted at 139,000 euros actions on the public road that runs between urbanization El Carrascal and place of the Marquis de las Fuentes.
The proposed works consist mainly in the provision of a sewerage system, replacement of floors and emptying a septic and aseptic removal of existing.
Councilman Works and Services, Juan Pedro Sánchez, stressed the importance of this action, since, in his words, "Until now there was no sanitation in line with this emblematic setting of high ecological value, which also located a youth hostel and other holiday accommodation. "
The above draft provision of infrastructure, we must add other actions that are currently underway in this area as environmental suitability and landscape restoration, funded with 250,000 euros through the Local Investment Fund, and the renovation and expansion of Nature's Classroom, funded by the Directorate General of Natural Heritage and Biodiversity with 65,000 euros.
Soon is expected to culminate the redevelopment of the Hall of Nature, which consist mainly of the expansion of multipurpose room and construction of toilets and stores.
In this renewed dependence held workshops for students, related to learning of the three ecosystems that characterize the landscape of Las Fuentes del Marqués (water system, Mediterranean forest and agricultural lands).
Source: Ayuntamiento de Caravaca de la Cruz